
Installation of the WeR@Home™ System
Figure 105: Add Tag Reader Window
8. The down-counter provides a time-frame of three (3) minutes within which the batteries should be
installed to power-up the Tag Reader, as demonstrated in Figure 106 below:
Figure 106: Inserting the Batteries into the Tag Reader
Verify batteries polarity to match marking within the batteries’ compartment.
Kommentare zu diesen Handbüchern