
Installation of the WeR@Home™ System
Figure 8: Insertion of the Backup Battery
Return the battery cover back to place. 8.
Plug the Power Supply's cable into the mini-USB
™
connector on the back of the CCU. 9.
Plug the adapter’s cube into an electric power outlet socket. 10.
The LED on the front panel of the Central Control Unit should light with orange color. 11.
Place the CCU in its designated location. 12.
Wait for the CCU’s front panel LED to switch from orange to green color before continuing to sub-13.
paragraph 3.2.3 below.
Notes: The LED switching from orange to green indicates that the CCU is properly
active. It takes approximately 5 minutes for the LED to switch.
The Central Control Unit is now ready for the next step of registration and setup.
Kommentare zu diesen Handbüchern